Nuclear Regulatory Commission
The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License (RFOL) No. NPF-69, issued to Constellation Energy Generation, LLC (CEG, or the licensee) for operation of the Nine Mile Point Nuclear Station, Unit 2, located in Oswego, New York. The proposed license amendment would revise the technical specifications (TS) to eliminate the requirement for automatic main steam line (MSL) isolation based on the temperature in the area around the MSL. In lieu of automatic isolation, a new specification is proposed that requires manual action when the MSL area temperature is above the limit.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Nuclear Regulatory Commission [Docket No. 50-410; NRC-2025-0742] AGENCY: Nuclear Regulatory Commission. ACTION: Opportunity to comment, request a hearing, and to petition for leave to intervene. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an amendment to Renewed Facility Operating License (RFOL) No. NPF-69, issued to Constellation Energy Generation, LLC (CEG, or the licensee) for operation of the Nine Mile Point Nuclear Station, Unit 2, located in Oswego, New York. The proposed license amendment would revise the technical specifications (TS) to eliminate the requirement for automatic main steam line (MSL) isolation based on the temperature in the area around the MSL. In lieu of automatic isolation, a new specification is proposed that requires manual action when the MSL area temperature is above the limit. DATES: Submit comments by September 4, 2025. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. Requests for a hearing or petition for leave to intervene must be filed by October 6, 2025. ADDRESSES: You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website. Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2025-0742. Address questions about Docket IDs in Regulations.gov to Bridge…
Other Federal Register documents from the same docket.
Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Unit 2; Exemption
Facility Operating License Amendment From Nine Mile Point Nuclear Station, LLC.; Nine Mile Point Nuclear Station, Unit 2
Nine Mile Point Nuclear Station, LLC, Nine Mile Point Nuclear Station, Unit No. 2, Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level
Nine Mile Point Nuclear Station, LLC; Nine Mile Point Nuclear Station, Unit No. 2; Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level, Correction
Nine Mile Point Nuclear Station, LLC, Nine Mile Point Nuclear Station, Unit No. 2; Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level
Citation: 90 FR 37574