Nuclear Regulatory Commission
This document corrects a draft Environmental Assessment (EA) appearing in the Federal Register on March 22, 2010 (75 FR 13600). This action is necessary to state the expiration date of the 30-day public comment period and to include instructions for submitting written comments to the NRC. The corrected draft EA is provided as follows: In accordance with 10 CFR 51.21, the NRC has prepared a draft EA as part of its evaluation of a request by Nine Mile Point Nuclear Station, LLC (the licensee) for a license amendment to increase the maximum thermal power at the Nine Mile Point Nuclear Station, Unit No. 2 (NMP2) from 3,467 megawatts thermal (MWt) to 3,988 MWt. This represents a power increase of approximately 15 percent over the current licensed thermal power, and approximately 20 percent from the original licensed power level of 3,323 MWt. The NRC staff did not identify any significant environmental impact associated with the proposed action based on its evaluation of the information provided in the licensee's extended power uprate (EPU) application and other available information. The draft EA and Finding of No Significant Impact are being published in the Federal Register with a 30-day public comment period ending May 10, 2010.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Nuclear Regulatory Commission [Docket No. 50-410; NRC-2010-0117] AGENCY: U.S. Nuclear Regulatory Commission (NRC). ACTION: Draft Environmental Assessment and Finding of No Significant Impact; Correction. SUMMARY: This document corrects a draft Environmental Assessment (EA) appearing in the Federal Register on March 22, 2010 ( 75 FR 13600 ). This action is necessary to state the expiration date of the 30-day public comment period and to include instructions for submitting written comments to the NRC. The corrected draft EA is provided as follows: In accordance with 10 CFR 51.21 , the NRC has prepared a draft EA as part of its evaluation of a request by Nine Mile Point Nuclear Station, LLC (the licensee) for a license amendment to increase the maximum thermal power at the Nine Mile Point Nuclear Station, Unit No. 2 (NMP2) from 3,467 megawatts thermal (MWt) to 3,988 MWt. This represents a power increase of approximately 15 percent over the current licensed thermal power, and approximately 20 percent from the original licensed power level of 3,323 MWt. The NRC staff did not identify any significant environmental impact associated with the proposed action based on its evaluation of the information provided in the licensee's extended power uprate (EPU) application and other available information. The draft EA and Finding of No Significant Impact are being published in the Federal Register with a 30-day public comment period ending May 10, 2010. Environmental Assessment Plant Site a…
Other Federal Register documents from the same docket.
Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Unit 2; Exemption
Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Unit 2; License Amendment Request
Facility Operating License Amendment From Nine Mile Point Nuclear Station, LLC.; Nine Mile Point Nuclear Station, Unit 2
Nine Mile Point Nuclear Station, LLC, Nine Mile Point Nuclear Station, Unit No. 2, Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level
Nine Mile Point Nuclear Station, LLC, Nine Mile Point Nuclear Station, Unit No. 2; Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment To Increase the Maximum Reactor Power Level
Citation: 75 FR 17970