Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Nuclear Regulatory Commission [Docket Nos. 50-346, 50-440, 50-334, and 50-412; License Nos. NPF-3, NPF-58, DPR-66 and NPF-73; EA 07-199] I FirstEnergy Nuclear Operating Company (FENOC or licensee) is the holder of four NRC Facility Operating Licenses issued by the U.S. Nuclear Regulatory Commission (NRC or Commission) pursuant to 10 CFR Part 50 , which authorizes the operation of the specifically-named facilities in accordance with the conditions specified in each license. License No. NPF-3 was issued on April 22, 1977, to operate the Davis-Besse Nuclear Power Station, Unit No. 1. License No. NPF-58 was issued on November 13, 1986, to operate the Perry Nuclear Power Plant, Unit No. 1. License Nos. DPR-66 and NPF-73 to operate the Beaver Valley Power Station, Units 1 and 2, were issued on July 2, 1976, and August 14, 1987, respectively. Davis-Besse is located near Toledo, Ohio; Perry is located near Painesville, Ohio; and Beaver Valley is located near McCandless, Pennsylvania. II The events leading up to this Confirmatory Order date back several years. In 2005, the NRC took enforcement action against FENOC, imposing a $5,450,000 civil penalty for regulatory violations associated with the 2002 reactor pressure vessel head degradation event at the Davis-Besse Plant. In response to that event, FENOC performed root cause evaluations. Among other things, FENOC's root cause reports determined that the reactor pressure vessel head degradation was the result of ongoing and undetected …
Other Federal Register documents from the same docket.
FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation, LLC, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1, Perry Nuclear Power Plant, Unit No. 1
FirstEnergy Nuclear Operating Company (FENOC) and FirstEnergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1, Perry Nuclear Power Plant, Unit No. 1
In the Matter of First Energy Nuclear Operating Company-Davis-Besse Nuclear Power Plant, Perry Nuclear Power Plant, and Beaver Valley Nuclear Plant, Units 1 and 2; Demand for Information
Citation: 72 FR 46668