Energy Department
DOE announces its decision to implement the Proposed Action alternative, identified as DOE's preferred alternative in the Final Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (DOE/EIS-0372). This alternative is to amend Presidential Permit PP-89 to authorize Bangor Hydro-Electric Company (BHE) to construct, operate, maintain, and connect a single- circuit, 345,000-volt (345-kV) electric transmission line that would originate at BHE's existing Orrington Substation, near Orrington, Maine, extend eastward approximately 85 miles, cross the United States (U.S.)-Canada border near Baileyville, Maine, and continue into New Brunswick, Canada. The proposed transmission line, referred to as the Northeast Reliability Interconnect (NRI), would be constructed along a route identified as the Modified Consolidated Corridors Route in the EIS. In reaching this decision, DOE considered the low environmental impacts in the U.S. from constructing, operating, and maintaining the NRI, the lack of adverse impacts to the reliability of the U.S. electric power supply system, and the lack of major issues of concern to the public. This ROD and Floodplain Statement of Findings have been prepared in accordance with the regulations of the Council on Environmental Quality (40 CFR Parts 1500-1508) for implementing the National Environmental Policy Act (NEPA), DOE's NEPA Implementing Procedures (10 CFR Part 1021), and DOE's Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR part 1022).
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy [Docket No. PP-89-1] AGENCY: Office of Electricity Delivery and Energy Reliability, U.S. Department of Energy (DOE). ACTION: Record of Decision (ROD) and Floodplain Statement of Findings. SUMMARY: DOE announces its decision to implement the Proposed Action alternative, identified as DOE's preferred alternative in the Final Environmental Impact Statement for the Bangor Hydro-Electric Company Northeast Reliability Interconnect (DOE/EIS-0372). This alternative is to amend Presidential Permit PP-89 to authorize Bangor Hydro-Electric Company (BHE) to construct, operate, maintain, and connect a single-circuit, 345,000-volt (345-kV) electric transmission line that would originate at BHE's existing Orrington Substation, near Orrington, Maine, extend eastward approximately 85 miles, cross the United States (U.S.)-Canada border near Baileyville, Maine, and continue into New Brunswick, Canada. The proposed transmission line, referred to as the Northeast Reliability Interconnect (NRI), would be constructed along a route identified as the Modified Consolidated Corridors Route in the EIS. In reaching this decision, DOE considered the low environmental impacts in the U.S. from constructing, operating, and maintaining the NRI, the lack of adverse impacts to the reliability of the U.S. electric power supply system, and the lack of major issues of concern to the public. This ROD and Floodplain Statement of Findings have been prepared in accordance with the regulations of t…
Other Federal Register documents from the same docket.
Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect
Notice of Intent To Prepare an Environmental Impact Statement and To Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement; Bangor Hydro-Electric Company
Application To Amend Presidential Permit; Bangor Hydro-Electric Company
Citation: 71 FR 587