Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit 345,000-volt (345-kV) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine. The proposed transmission line would originate at BHE's existing Orrington Substation, located in Orrington, Maine, and extend eastward approximately 85 miles to the international border between the United States and Canada where it would connect with similar facilities to be owned by New Brunswick Power Corporation (NB Power). DOE has determined that amendment of the Presidential permit would constitute a major Federal action that may have a significant impact upon the environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). For this reason, DOE intends to prepare an environmental impact statement (EIS) entitled, "The Northeast Reliability Interconnect" (DOE/EIS-0372), to address potential environmental impacts from the proposed action and the range of reasonable alternatives. The purpose of this Notice of Intent is to inform the public about the proposed action, announce plans to conduct three public scoping meetings in the vicinity of the proposed transmission line, invite public participation in the scoping process, and solicit public comments for consideration in establishing the scope and content of the EIS. Because the proposed project may involve an action in a floodplain or wetland, the draft EIS will include a floodplain and wetlands assessment and the final EIS or record of decision will include a floodplain statement of findings in accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements (10 CFR part 1022).
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy [Docket No. PP-89-1] AGENCY: Department of Energy (DOE). ACTION: Notice of intent to prepare an environmental impact statement and to conduct public scoping meetings, and notice of floodplain and wetlands involvement. SUMMARY: Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit 345,000-volt (345-kV) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine. The proposed transmission line would originate at BHE's existing Orrington Substation, located in Orrington, Maine, and extend eastward approximately 85 miles to the international border between the United States and Canada where it would connect with similar facilities to be owned by New Brunswick Power Corporation (NB Power). DOE has determined that amendment of the Presidential permit would constitute a major Federal action that may have a significant impact upon the environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). For this reason, DOE intends to prepare an environmental impact statement (EIS) entitled, “The Northeast Reliability Interconnect” (DOE/EIS-0372), to address potential environmental impacts from the proposed action and the range of reasonable alternatives. The purpose of this Notice of Intent is to inform the public about the proposed action, announce plans to conduct three public scoping meetings in the vi…
Other Federal Register documents from the same docket.
Record of Decision and Floodplain Statement of Findings; Bangor Hydro-Electric Company Northeast Reliability Interconnect
Notice of Public Hearings for the Proposed Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect
Application To Amend Presidential Permit; Bangor Hydro-Electric Company
Citation: 69 FR 63514