Notice of Intent To Prepare an Environmental Impact Statement and To Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement; Bangor Hydro-Electric Company

Energy Department

Abstract

Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit 345,000-volt (345-kV) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine. The proposed transmission line would originate at BHE's existing Orrington Substation, located in Orrington, Maine, and extend eastward approximately 85 miles to the international border between the United States and Canada where it would connect with similar facilities to be owned by New Brunswick Power Corporation (NB Power). DOE has determined that amendment of the Presidential permit would constitute a major Federal action that may have a significant impact upon the environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). For this reason, DOE intends to prepare an environmental impact statement (EIS) entitled, "The Northeast Reliability Interconnect" (DOE/EIS-0372), to address potential environmental impacts from the proposed action and the range of reasonable alternatives. The purpose of this Notice of Intent is to inform the public about the proposed action, announce plans to conduct three public scoping meetings in the vicinity of the proposed transmission line, invite public participation in the scoping process, and solicit public comments for consideration in establishing the scope and content of the EIS. Because the proposed project may involve an action in a floodplain or wetland, the draft EIS will include a floodplain and wetlands assessment and the final EIS or record of decision will include a floodplain statement of findings in accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements (10 CFR part 1022).

Action & Dates

Action
Notice of intent to prepare an environmental impact statement and to conduct public scoping meetings, and notice of floodplain and wetlands involvement.
Dates
DOE invites interested agencies, organizations, Native American tribes, and members of the public to submit comments or suggestions to assist in identifying significant environmental issues and in determining the appropriate scope of the EIS. The public scoping period starts with the publication of this notice in the Federal Register and will continue until December 2, 2004. Written and oral comments will be given equal weight, and DOE will consider all comments received or postmarked by December 2, 2004, in defining the scope of this EIS. Comments received or postmarked after that date will be considered to the extent practicable.

Public Comment

Comments Close
2004-12-02

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy [Docket No. PP-89-1] AGENCY: Department of Energy (DOE). ACTION: Notice of intent to prepare an environmental impact statement and to conduct public scoping meetings, and notice of floodplain and wetlands involvement. SUMMARY: Bangor Hydro-Electric Company (BHE) has applied to DOE to amend Presidential Permit PP-89, which authorizes BHE to construct a single-circuit 345,000-volt (345-kV) electric transmission line across the U.S. international border in the vicinity of Baileyville, Maine. The proposed transmission line would originate at BHE's existing Orrington Substation, located in Orrington, Maine, and extend eastward approximately 85 miles to the international border between the United States and Canada where it would connect with similar facilities to be owned by New Brunswick Power Corporation (NB Power). DOE has determined that amendment of the Presidential permit would constitute a major Federal action that may have a significant impact upon the environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). For this reason, DOE intends to prepare an environmental impact statement (EIS) entitled, “The Northeast Reliability Interconnect” (DOE/EIS-0372), to address potential environmental impacts from the proposed action and the range of reasonable alternatives. The purpose of this Notice of Intent is to inform the public about the proposed action, announce plans to conduct three public scoping meetings in the vi

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 69 FR 63514

Notice of Intent To Prepare an Environmental Impact Statement and To Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement; Bangor Hydro-Electric Company — Federal Register 04-24404 | Open Gov by Base