Homeland Security Department, Coast Guard
The Coast Guard is extending the effective period for the 13 temporary 500-meter temporary safety zones around the construction of 12 wind turbine generators (WTGs) and one offshore substation (OSS) located in the South Fork Wind Farm (SFWF) project area within Federal waters on the Outer Continental Shelf (OCS), specifically, in the Bureau of Ocean Energy Management (BOEM) Renewable Energy Lease Area OCS-A 0517, approximately 16 nautical miles (NM) southeast of Block Island, Rhode Island, and 30 NM east of Montauk Point, New York. This rule extends the effective period of the existing safety zones for an additional five months. The safety zones will now end on May 31, 2024. This action is necessary to provide for the safety of life, property, and the environment during the anticipated construction of each facility's monopile type foundation and subsequent installation of the WTGs turbines and OSS platform. When enforced, only attending vessels and those vessels specifically authorized by the First Coast Guard District Commander or a designated representative are permitted to enter or remain in the safety zones.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Homeland Security Coast Guard 33 CFR Part 147 [Docket Number USCG-2023-0073] RIN 1625-AA00 AGENCY: Coast Guard, Department of Homeland Security (DHS). ACTION: Temporary interim rule and request for comments. SUMMARY: The Coast Guard is extending the effective period for the 13 temporary 500-meter temporary safety zones around the construction of 12 wind turbine generators (WTGs) and one offshore substation (OSS) located in the South Fork Wind Farm (SFWF) project area within Federal waters on the Outer Continental Shelf (OCS), specifically, in the Bureau of Ocean Energy Management (BOEM) Renewable Energy Lease Area OCS-A 0517, approximately 16 nautical miles (NM) southeast of Block Island, Rhode Island, and 30 NM east of Montauk Point, New York. This rule extends the effective period of the existing safety zones for an additional five months. The safety zones will now end on May 31, 2024. This action is necessary to provide for the safety of life, property, and the environment during the anticipated construction of each facility's monopile type foundation and subsequent installation of the WTGs turbines and OSS platform. When enforced, only attending vessels and those vessels specifically authorized by the First Coast Guard District Commander or a designated representative are permitted to enter or remain in the safety zones. DATES: This temporary interim rule is effective from January 1, 2024, through May 31, 2024. Comments and related material must be received …
Other Federal Register documents from the same docket.
Safety Zone; South Fork Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0517, Offshore Rhode Island, Atlantic Ocean
Safety Zone; South Fork Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0517, Offshore Rhode Island, Atlantic Ocean; Corrections
Safety Zone; South Fork Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0517, Offshore Rhode Island, Atlantic Ocean
Citation: 88 FR 87716