Safety Zone; South Fork Wind Farm Project Area, Outer Continental Shelf, Lease OCS-A 0517, Offshore Rhode Island, Atlantic Ocean

Homeland Security Department, Coast Guard

Abstract

The Coast Guard is establishing 13 temporary 500-meter safety zones around the construction of 12 wind turbine generators (WTGs) and one offshore substation (OSS) located in the South Fork Wind Farm (SFWF) project area within federal waters on the Outer Continental Shelf (OCS), specifically, in the Bureau of Ocean Energy Management (BOEM) Renewable Energy Lease Area OCS-A 0517, approximately 16 nautical miles (NM) southeast of Block Island, Rhode Island, and 30 NM east of Montauk Point, New York. This action is necessary to provide for the safety of life, property, and the environment during the anticipated construction of each facility's monopile type foundation and subsequent installation of the WTGs turbines and OSS platform from May 1, 2023, to December 31, 2023. When enforced, only attending vessels and those vessels specifically authorized by the First Coast Guard District Commander or a designated representative are permitted to enter or remain in the safety zones.

Action & Dates

Action
Temporary final rule.
Dates
his rule is effective without actual notice from May 2, 2023, through 11:59 p.m. on December 31, 2023. For the purposes of enforcement, actual notice will be used from May 1, 2023, until May 2, 2023.
Effective Date
2023-05-02

CFR References

Topics

Continental shelfMarine safetyNavigation (water)

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Homeland Security Coast Guard 33 CFR Part 147 [Docket Number USCG-2023-0073] RIN 1625-AA00 AGENCY: Coast Guard, Department of Homeland Security (DHS). ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing 13 temporary 500-meter safety zones around the construction of 12 wind turbine generators (WTGs) and one offshore substation (OSS) located in the South Fork Wind Farm (SFWF) project area within federal waters on the Outer Continental Shelf (OCS), specifically, in the Bureau of Ocean Energy Management (BOEM) Renewable Energy Lease Area OCS-A 0517, approximately 16 nautical miles (NM) southeast of Block Island, Rhode Island, and 30 NM east of Montauk Point, New York. This action is necessary to provide for the safety of life, property, and the environment during the anticipated construction of each facility's monopile type foundation and subsequent installation of the WTGs turbines and OSS platform from May 1, 2023, to December 31, 2023. When enforced, only attending vessels and those vessels specifically authorized by the First Coast Guard District Commander or a designated ( printed page 27403) representative are permitted to enter or remain in the safety zones. DATES: his rule is effective without actual notice from May 2, 2023, through 11:59 p.m. on December 31, 2023. For the purposes of enforcement, actual notice will be used from May 1, 2023, until May 2, 2023. ADDRESSES: To view documents mentioned in this preamble as being available in th

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document