Transportation Department, Pipeline and Hazardous Materials Safety Administration
PHMSA is revising the Federal Pipeline Safety Regulations to improve the safety of onshore gas transmission pipelines. This final rule addresses several lessons learned following the Pacific Gas and Electric Company incident that occurred in San Bruno, CA, on September 9, 2010, and responds to public input received as part of the rulemaking process. The amendments in this final rule clarify certain integrity management provisions, codify a management of change process, update and bolster gas transmission pipeline corrosion control requirements, require operators to inspect pipelines following extreme weather events, strengthen integrity management assessment requirements, adjust the repair criteria for high-consequence areas, create new repair criteria for non-high consequence areas, and revise or create specific definitions related to the above amendments.
This document has been corrected by:
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Transportation Pipeline and Hazardous Materials Safety Administration 49 CFR Part 192 [Docket No. PHMSA-2011-0023; Amdt. No. 192-132] RIN 2137-AF39 AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: PHMSA is revising the Federal Pipeline Safety Regulations to improve the safety of onshore gas transmission pipelines. This final rule addresses several lessons learned following the Pacific Gas and Electric Company incident that occurred in San Bruno, CA, on September 9, 2010, and responds to public input received as part of the rulemaking process. The amendments in this final rule clarify certain integrity management provisions, codify a management of change process, update and bolster gas transmission pipeline corrosion control requirements, require operators to inspect pipelines following extreme weather events, strengthen integrity management assessment requirements, adjust the repair criteria for high-consequence areas, create new repair criteria for non-high consequence areas, and revise or create specific definitions related to the above amendments. DATES: The final rule is effective May 24, 2023. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of May 24, 2023. The incorporation by reference of other publications listed in this rule was approved by the Director of the Federal Register on July 1,…
Other Federal Register documents from the same docket.
Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments; Correction
Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Corrections To Conform to Judicial Review
Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Technical Corrections; Response to Petitions for Reconsideration
Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments
Pipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments: Technical Corrections
Citation: 87 FR 52224