Interior Department, Reclamation Bureau
Pursuant to the National Environmental Policy Act (NEPA), the Bureau of Reclamation (Reclamation) is notifying the public that Reclamation and the State of North Dakota have prepared a Final EIS for the Red River Valley Water Supply Project (RRVWSP). The purpose of the RRVWSP is to supply water to meet the water needs of the people and industries in the Red River Valley through the year 2050. The project's needs were established by Congress in the Dakota Water Resources Act of 2000. The project needs are defined as municipal, rural, and industrial supplies; water quality; aquatic environment; and water conservation measures. Reclamation published a Draft EIS on December 30, 2005. Following public comments on the Draft EIS and the addition of new information, Reclamation published a Supplemental Draft EIS on January 31, 2007. The comment period for the Draft EIS started on December 30, 2005 and continued through April 25, 2007 with review of the Supplemental Draft EIS. Revisions were made to the Final EIS to incorporate responses to comments on the Supplemental Draft EIS and new information. However, these revisions do not significantly impact the analysis or results presented in the Supplemental Draft EIS. The primary changes are inclusion of a final biological assessment prepared in compliance with the Endangered Species Act, an analysis of forecasted depletions and sedimentation on the Missouri River mainstem reservoir system, and a literature review of the best available climate change information. The Final EIS includes written responses to all public comments on both the DEIS and SDEIS. It also identifies the GDU Import to Sheyenne River Alternative as Reclamation's and the State of North Dakota's preferred alternative.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of the Interior Bureau of Reclamation AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Availability of Final Environmental Impact Statement (EIS). SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the Bureau of Reclamation (Reclamation) is notifying the public that Reclamation and the State of North Dakota have prepared a Final EIS for the Red River Valley Water Supply Project (RRVWSP). The purpose of the RRVWSP is to supply water to meet the water needs of the people and industries in the Red River Valley through the year 2050. The project's needs were established by Congress in the Dakota Water Resources Act of 2000. The project needs are defined as municipal, rural, and industrial supplies; water quality; aquatic environment; and water conservation measures. Reclamation published a Draft EIS on December 30, 2005. Following public comments on the Draft EIS and the addition of new information, Reclamation published a Supplemental Draft EIS on January 31, 2007. The comment period for the Draft EIS started on December 30, 2005 and continued through April 25, 2007 with review of the Supplemental Draft EIS. Revisions were made to the Final EIS to incorporate responses to comments on the Supplemental Draft EIS and new ( printed page 72759) information. However, these revisions do not significantly impact the analysis or results presented in the Supplemental Draft EIS. The primary changes are inclusion of a final biological assessment prepared…
Citation: 72 FR 72758