Base
NoticeE7-244452007-12-18

Notice of Availability to Distribute a Record of Decision for the Construction of a New U.S. Commercial Port of Entry in Derby Line, Vermont

General Services Administration

Abstract

The General Services Administration (GSA), along with the Federal Highway Administration and the Vermont Agency of Transportation as cooperating agencies, announces its intent to distribute a Record of Decision (ROD) prepared pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, 42 USC 4321--4347 (NEPA) that documents GSA's efforts to assess the potential impacts of the construction of a new U.S. Commercial Port of Entry in Derby Line, Vermont (the "Proposed Action"). At the request of Customs and Border Protection (CBP), the GSA is proposing to construct a new Commercial Port of Entry which meets their needs as well as the design requirements of GSA. The existing Port of Entry site and facilities are inefficient and are very difficult to maneuver through, especially for large trucks, resulting in extensive queuing and delays. Additionally, all building spaces are currently fully occupied and there is no swing or vacant space that could be utilized to house the additional requirements at this site. Due to the current layout, expansion of existing spaces is not possible. Due to organizational changes within CBP in the past few years, as well as changes in requirements and usage of the Port of Entry, the existing facility is outdated and no longer adequately meets its current or future requirements. The Proposed Action has been defined and includes: (a) Identification of land requirements, including acquisition of adjoining land; (b) demolition of existing government structures at the Port of Entry; (c) construction of a main administration building and ancillary support buildings; and (d) consequent potential alterations to Route I-91 and secondary roads. Studied alternatives have identified alternative locations for the components of the Port of Entry including the main administration and ancillary support buildings, the associated roadway network and parking. A No-Action alternative has also been studied and evaluates the consequences of not constructing the new facility. This alternative has been included to provide a basis for comparison to the action alternatives as required by NEPA regulations (40 CFR 1002.14(d)).

Action & Dates

Action
Notice of Availability.
Dates
January 17, 2008.

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. General Services Administration [PBS-N01] AGENCY: Public Buildings Service, GSA. ACTION: Notice of Availability. SUMMARY: The General Services Administration (GSA), along with the Federal Highway Administration and the Vermont Agency of Transportation as cooperating agencies, announces its intent to distribute a Record of Decision (ROD) prepared pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, 42 USC 4321—4347 (NEPA) that documents GSA’s efforts to assess the potential impacts of the construction of a new U.S. Commercial Port of Entry in Derby Line, Vermont (the “Proposed Action”). At the request of Customs and Border Protection (CBP), the GSA is proposing to construct a new Commercial Port of Entry which meets their needs as well as the design requirements of GSA. The existing Port of Entry site and facilities are inefficient and are very difficult to maneuver through, especially for large trucks, resulting in extensive queuing and delays. Additionally, all building spaces are currently fully occupied and there is no swing or vacant space that could be utilized to house the additional requirements at this site. Due to the current layout, expansion of existing spaces is not possible. Due to organizational changes within CBP in the past few years, as well as changes in requirements and usage of the Port of Entry, the existing facility is outdated and no longer adequately meets its current or future requirements. The Proposed

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 72 FR 71690