Base
Notice2026-098172026-05-15

Notice of Final Federal Agency Actions on Proposed Transportation Project in Utah

Transportation Department, Federal Highway Administration

Abstract

The FHWA, on behalf of the Utah Department of Transportation (UDOT), is issuing this notice to announce actions taken by UDOT and other Federal agencies that are final agency actions. These actions relate to the proposed transportation improvements on State Route 190 (SR-190) in Salt Lake County, Utah. The Proposed Action integrates enhanced bus service, improved bus stop facilities, a dedicated bus priority lane on Brighton Loop Road, and a congestion-based tolling system. Additional proposed infrastructure at the base of Big Cottonwood Canyon (BCC) includes the construction of a mobility hub parking facility, which will provide approximately 1,750 public parking spaces, on the eastern side of Wasatch Boulevard. To facilitate mobility hub access and transit efficiency, the project includes a new grade-separated interchange on Wasatch Boulevard and a new transitway to provide a dedicated route for buses to bypass congestion at the base of BCC.

Action & Dates

Action
Notice of limitation on claims for judicial review.
Dates
By this notice, the FHWA, on behalf of UDOT, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal Agency actions on the listed highway project will be barred unless the claim is filed on or before October 13, 2026. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies.

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Transportation Federal Highway Administration AGENCY: Federal Highway Administration (FHWA), Department of Transportation. ACTION: Notice of limitation on claims for judicial review. SUMMARY: The FHWA, on behalf of the Utah Department of Transportation (UDOT), is issuing this notice to announce actions taken by UDOT and other Federal agencies that are final agency actions. These actions relate to the proposed transportation improvements on State Route 190 (SR-190) in Salt Lake County, Utah. The Proposed Action integrates enhanced bus service, improved bus stop facilities, a dedicated bus priority lane on Brighton Loop Road, and a congestion-based tolling system. Additional proposed infrastructure at the base of Big Cottonwood Canyon (BCC) includes the construction of a mobility hub parking facility, which will provide approximately 1,750 public parking spaces, on the eastern side of Wasatch Boulevard. To facilitate mobility hub access and transit efficiency, the project includes a new grade-separated interchange on Wasatch Boulevard and a new transitway to provide a dedicated route for buses to bypass congestion at the base of BCC. DATES: By this notice, the FHWA, on behalf of UDOT, is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1) . A claim seeking judicial review of the Federal Agency actions on the listed highway project will be barred unless the claim is filed on or before October 13, 2026. If the Federal law that authorizes judic

Read full document on FederalRegister.gov →

Full Document

Citation: 91 FR 28098

Notice of Final Federal Agency Actions on Proposed Transportation Project in Utah — Federal Register 2026-09817 | Open Gov by Base