Transportation Department, Pipeline and Hazardous Materials Safety Administration
This document corrects the preamble and amendatory regulatory text within a proposed rule published in the Federal Register of April 24, 2026 regarding monetary thresholds for certain gas pipeline facility construction notifications. This correction corrects monetary thresholds to match the intended values referenced elsewhere in the preamble.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Transportation Pipeline and Hazardous Materials Safety Administration 49 CFR Parts 191 and 195 [Docket No. PHMSA-2026-1551] RIN 2137-AG55 ( printed page 24154) AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT). ACTION: Proposed rule; correction. SUMMARY: This document corrects the preamble and amendatory regulatory text within a proposed rule published in the Federal Register of April 24, 2026 regarding monetary thresholds for certain gas pipeline facility construction notifications. This correction corrects monetary thresholds to match the intended values referenced elsewhere in the preamble. DATES: May 5, 2026. FOR FURTHER INFORMATION CONTACT: Sayler Palabrica, Transportation Specialist, 1200 New Jersey Avenue SE, Washington, DC 20590, 202-744-0825, sayler.palabrica@dot.gov . SUPPLEMENTARY INFORMATION: PHMSA is correcting the proposed rule titled “Pipeline Safety Adjustment to OPID Notifications for Construction” that published in the Federal Register on April 24, 2026. [ 1 ] The first paragraph in section I (General Discussion) of the proposed rule correctly described PHMSA's intention to increase existing 49 CFR 191.22(c) monetary thresholds for operator notifications to PHMSA regarding certain construction activity on gas pipeline facilities to account for inflation since the introduction of those thresholds. That paragraph explained that PHMSA was proposing to increase the monetary thresh…
Other Federal Register documents from the same docket.
Citation: 91 FR 24154