Interior Department, Surface Mining Reclamation and Enforcement Office
The Office of Surface Mining Reclamation and Enforcement (OSM) is confirming the effective date of the direct final rule entitled, "Backfilling and Grading," which was originally published on November 28, 2025. The direct final rule rescinded a regulation that prescribed time and distance performance standards for the completion of rough backfilling and grading for surface mining operations that were suspended by the Secretary of the Interior in 1992 but never removed from the Code of Federal Regulations. During the comment period, OSM received two comments that required further review and consideration to determine whether the comments warranted a response or the withdrawal or modification of the final rule. After further review and consideration, OSM determined that these comments were not significant adverse comments and is confirming the effective date of this rule.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of the Interior Office of Surface Mining Reclamation and Enforcement 30 CFR Part 816 [Docket ID: OSM-2025-0025 S1D1S SS08011000 SX064A000 256S180110; S2D2S SS08011000 SX064A000 25XS501520] RIN 1029-AD03 AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Direct final rule; confirmation of effective date. SUMMARY: The Office of Surface Mining Reclamation and Enforcement (OSM) is confirming the effective date of the direct final rule entitled, “Backfilling and Grading,” which was originally published on November 28, 2025. The direct final rule rescinded a regulation that prescribed time and distance performance standards for the completion of rough backfilling and grading for surface mining operations that were suspended by the Secretary of the Interior in 1992 but never removed from the Code of Federal Regulations. During the comment period, OSM received two comments that required further review and consideration to determine whether the comments warranted a response or the withdrawal or modification of the final rule. After further review and consideration, OSM determined that these comments were not significant adverse comments and is confirming the effective date of this rule. DATES: The effective date of March 30, 2026, for the direct final rule published at 90 FR 54573 (Nov. 28, 2025), delayed at 91 FR 3374 January 27, 2026, is confirmed. FOR FURTHER INFORMATION CONTACT: James Tyree, Chief, Division of Regulatory Support,…
Other Federal Register documents from the same docket.
Citation: 91 FR 15884