Energy Department, Federal Energy Regulatory Commission
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission [Project No. 8405-024] ( printed page 12722) Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent License for Minor Project. b. Project No.: 8405-024. c. Date Filed: February 27, 2025. d. Applicant: Green Mountain Power Corporation (GMP). e. Name of Project: Glen Hydroelectric Project (project). f. Location: The existing project is located on the Mascoma River in Grafton County, New Hampshire. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r) . h. Applicant Contact: Mr. John Tedesco, Generation Project Coordinator, Green Mountain Power Corporation, 163 Acorn Lane Colchester, VT 05446; Phone at (802) 655-8753, or email at John.Tedesco@greenmountainpower.com . i. FERC Contact: Steve Kartalia at (202) 502-6131, or stephen.kartalia@ferc.gov . j. The application is not ready for environmental analysis at this time. k. The existing Glen Project consists of a 173-foot-long, 14-foot-high concrete gravity dam that includes the following sections: (1) a 5-foot-long south abutment section; (2) a 123-foot-long, 12-foot-high spillway section equipped with: (a) 3-foot-high flashboards with a crest elevation of 413.2 feet National Geodetic Vertical Datum of 1929 (NGVD 29) at the top of the flashboards; (b) a 1-foot-wide concrete pier; (c) a trash sluice; and (d) a 4-foot-diameter, 14-foot-long steel pipe tha…
Other Federal Register documents from the same docket.
Green River Power Corporation; Notice of Reasonable Period of Time for Water Quality Certification Application
Green Mountain Power Corporation; Notice of Intent To Prepare an Environmental Assessment
Green Mountain Power Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Citation: 90 FR 12722