Base
Notice2025-027112025-02-18

Gulf South Pipeline Company, LLC; Notice of Application and Establishing Intervention Deadline

Energy Department, Federal Energy Regulatory Commission

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission [Docket No. CP25-54-000] Take notice that on January 28, 2025, Gulf South Pipeline Company, LLC (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, filed an application under section 7(b) and 7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission's regulations requesting authorization to undertake the Parks Line Upgrade and Sorrento Station Project (PLUSS Project) in St. Martin and Ascension parishes, Louisiana. Specifically, the PLUSS Project would include the replacement of approximately 4.5 miles of non-contiguous segments of Gulf South's existing 30-inch-diameter Index 330 pipeline in St. Martin Parish, Louisiana, [ 1 ] and the construction of a new 12,510 horsepower Sorrento Compressor Station on its existing 24-inch-diameter Index 270 pipeline in Ascension Parish, Louisiana, and appurtenant facilities. The Sorrento Compressor Station will connect to Gulf South's existing Index 270 pipeline through two new 30-inch-diameter suction and discharge pipelines, each approximately 0.29 miles long. Gulf South also proposes approximately 1.06 miles of 20-inch-diameter delivery lateral to connect the new meter and regulator station within the proposed Sorrento Compressor Station to a Project customer's facilities. The PLUSS Project will enable Gulf South to add 236,000 dekatherms per day (Dth/d) of capacity to its system  [ 2 ] and optimize the operation of the Index 330 pipeline, thereby imp

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 90 FR 9718