Energy Department
The Office of Fossil Energy and Carbon Management (FECM) of the Department of Energy (DOE) gives notice (Notice) of receipt of an application (Application), filed by Sabine Pass Liquefaction, LLC and Sabine Pass Liquefaction Stage V, LLC (collectively, Sabine Pass Stage 5 or Sabine Pass) on March 1, 2024, and supplemented on March 21, 2024. Sabine Pass Stage 5 requests long-term, multi-contract authorization to export domestically produced liquefied natural gas (LNG) in a volume equivalent to approximately 899.46 billion cubic feet (Bcf) per year (Bcf/yr) of natural gas from the proposed Sabine Pass Stage 5 Expansion Project (Trains 7-8) (Stage 5 Project) to be added to the existing Sabine Pass LNG Terminal (SPLNG Terminal) located in Cameron Parish, Louisiana. Sabine Pass Stage 5 filed the Application under the Natural Gas Act (NGA).
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy [Docket No. 24-27-LNG] AGENCY: Office of Fossil Energy and Carbon Management, Department of Energy. ACTION: Notice of application. SUMMARY: The Office of Fossil Energy and Carbon Management (FECM) of the Department of Energy (DOE) gives notice (Notice) of receipt of an application (Application), filed by Sabine Pass Liquefaction, LLC and Sabine Pass Liquefaction Stage V, LLC (collectively, Sabine Pass Stage 5 or Sabine Pass) on March 1, 2024, and supplemented on March 21, 2024. Sabine Pass Stage 5 requests long-term, multi-contract authorization to export domestically produced liquefied natural gas (LNG) in a volume equivalent to approximately 899.46 billion cubic feet (Bcf) per year (Bcf/yr) of natural gas from the proposed Sabine Pass Stage 5 Expansion Project (Trains 7-8) (Stage 5 Project) to be added to the existing Sabine Pass LNG Terminal (SPLNG Terminal) located in Cameron Parish, Louisiana. Sabine Pass Stage 5 filed the Application under the Natural Gas Act (NGA). DATES: Protests, motions to intervene, or notices of intervention, as applicable, requests for additional procedures, and written comments are to be filed as detailed in the Public Comment Procedures section no later than 4:30 p.m., Eastern time, June 18, 2024. ADDRESSES: Electronic Filing by email (Strongly encouraged): fergas@hq.doe.gov . Postal Mail, Hand Delivery, or Private Delivery Services ( e.g., FedEx, UPS, etc.): U.S. Department of Energy (FE-34), Office of Regulation, Analysis…
Other Federal Register documents from the same docket.
Citation: 89 FR 28762