Engineering and Design Materials for Liquefied Natural Gas Facilities Related to Potential Impacts Caused by Natural Hazards

Energy Department, Federal Energy Regulatory Commission

Abstract

The Federal Energy Regulatory Commission (Commission) issues this final rule to revise its regulations governing liquefied natural gas (LNG) facilities subject to sections 3 and 7 of the Natural Gas Act (NGA) by removing outdated references for seismic hazard evaluations and seismic design criteria for LNG facilities. In their place, the Commission codifies its existing practice of evaluating seismic and other natural hazards and design criteria for jurisdictional LNG facilities. These revisions are intended to reduce confusion about applicable technical requirements and clarify the information required in applications filed before the Commission to ensure the public is protected from potential catastrophic impacts caused by natural hazards from design through the operation of the LNG facilities.

Action & Dates

Action
Final rule.
Dates
This rule is effective December 29, 2023.
Effective Date
2023-12-29

CFR References

Topics

Environmental impact statementsExportsImportsNatural gasReporting and recordkeeping requirements

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission 18 CFR Parts 153 and 380 [Docket No. RM22-8-000; Order No. 900] AGENCY: Federal Energy Regulatory Commission, Department of Energy. ACTION: Final rule. SUMMARY: The Federal Energy Regulatory Commission (Commission) issues this final rule to revise its regulations governing liquefied natural gas (LNG) facilities subject to sections 3 and 7 of the Natural Gas Act (NGA) by removing outdated references for seismic hazard evaluations and seismic design criteria for LNG facilities. In their place, the Commission codifies its existing practice of evaluating seismic and other natural hazards and design criteria for jurisdictional LNG facilities. These revisions are intended to reduce confusion about applicable technical requirements and clarify the information required in applications filed before the Commission to ensure the public is protected from potential catastrophic impacts caused by natural hazards from design through the operation of the LNG facilities. DATES: This rule is effective December 29, 2023. FOR FURTHER INFORMATION CONTACT: Andrew Kohout (Technical Information), Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502-8053, andrew.kohout@ferc.gov . Kenneth Yu (Legal Information), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502-8482, kenneth.yu@ferc.gov . SUPPLEMENTARY INFORMA

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 88 FR 74033