Energy Department, Federal Energy Regulatory Commission
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission [Project No. 2513-091] Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2513-091. c. Date Filed: February 28, 2023. d. Applicant: Green Mountain Power Corporation (GMP). e. Name of Project: Essex No. 19 Hydroelectric Project. f. Location: On the Winooski River in Chittenden County, Vermont. The project does not affect Federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r) . h. Applicant Contact: Mr. John Tedesco, Green Mountain Power Corporation, 163 Acorn Lane, Colchester, Vermont 05446; phone: (802) 655-8753 or email at John.Tedesco@greenmountainpower.com . i. FERC Contact: Michael Tust at (202) 502-6522 or email at michael.tust@ferc.gov . j. This application is not ready for environmental analysis at this time. k. Project Description: The existing project consists of: (1) a 494-foot-long concrete gravity dam consisting of a 61-foot-high non-overflow concrete abutment section and three overflow spillway sections 46-foot-high and each topped by a 5-foot-high inflatable rubber dam; (2) a 268-acre impoundment; (3) a 78-foot-wide, 36-foot-high concrete intake structure with two concrete wing walls, a steel trashrack with one-inch bar spacing, and an embedded downstream fishway; (4) two 3-foot-diameter steel penstocks and four 9-foot-diameter steel penstocks…
Other Federal Register documents from the same docket.
Green Mountain Power Corporation; Notice of Intent To Prepare an Environmental Assessment
Green Mountain Power Corporation; Notice of Reasonable Period of Time for Water Quality Certification Application
Green Mountain Power Corporation; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Green Mountain Power Corporation; Notice of Revised Procedural Schedule
Citation: 88 FR 15011