Base
Rule2021-155292021-07-22

Ocean Dumping; Modification of an Ocean Dredged Material Disposal Site Offshore Port Everglades, Florida

Environmental Protection Agency

Abstract

The Environmental Protection Agency (EPA) is expanding the size of the EPA designated ocean dredged material disposal site (ODMDS) offshore of Port Everglades, Florida (referred to hereafter as the existing Port Everglades ODMDS), pursuant to the Marine Protection, Research and Sanctuaries Act (MPRSA). The primary purpose for the site modification is to enlarge the site to provide for the long-term disposal capacity to dump suitable material dredged from the Port Everglades Harbor in ocean waters. The modified site will be subject to monitoring and management to ensure continued protection of the marine environment.

Action & Dates

Action
Final rule.
Dates
Effective: August 23, 2021.
Effective Date
2021-08-23

CFR References

Topics

Environmental protectionWater pollution control

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Environmental Protection Agency 40 CFR Part 228 [EPA-R04-OW-2020-0056; FRL-8737-01-R4] AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Environmental Protection Agency (EPA) is expanding the size of the EPA designated ocean dredged material disposal site (ODMDS) offshore of Port Everglades, Florida (referred to hereafter as the existing Port Everglades ODMDS), pursuant to the Marine Protection, Research and Sanctuaries Act (MPRSA). The primary purpose for the site modification is to enlarge the site to provide for the long-term disposal capacity to dump suitable material dredged from the Port Everglades Harbor in ocean waters. The modified site will be subject to monitoring and management to ensure continued protection of the marine environment. DATES: Effective: August 23, 2021. ADDRESSES: EPA has established a docket for this action under Docket ID No. EPA-R04-OW-2020-0056. All documents in the docket are listed on the http://www.regulations.gov website. FOR FURTHER INFORMATION CONTACT: Wade Lehmann, U.S. Environmental Protection Agency, Region 4, Water Division, Oceans and Estuarine Management Section, 61 Forsyth Street, Atlanta, Georgia 30303; phone number (404) 562-8082; email: Lehmann.Wade@epa.gov . SUPPLEMENTARY INFORMATION: EPA proposed rulemaking on March 13, 2020, and re-released for further public review on May 22, 2020 ( 85 FR 14622 and 85 FR 31133 ), which was a proposal to expand the size of the Port Everglades ODMDS. Additionally,…

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 86 FR 38563