Base
RuleSignificant2021-106232021-05-20

Reissuance and Modification of Nationwide Permits; Correction

Defense Department, Engineers Corps

Abstract

The U.S. Army Corps of Engineers published a document in the Federal Register of January 13, 2021, a final rule concerning the reissuance and modification of nationwide permits. This document contains a correction to the rule.

Action & Dates

Action
Final rule; correction.
Dates
This correction is effective May 20, 2021, and is applicable beginning March 15, 2021.
Effective Date
2021-05-20

CFR References

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Defense Department of the Army, Corps of Engineers 33 CFR Chapter II [Docket Number: COE-2020-0002] RIN 0710-AA84 AGENCY: Army Corps of Engineers, DoD. ACTION: Final rule; correction. SUMMARY: The U.S. Army Corps of Engineers published a document in the Federal Register of January 13, 2021, a final rule concerning the reissuance and modification of nationwide permits. This document contains a correction to the rule. DATES: This correction is effective May 20, 2021, and is applicable beginning March 15, 2021. ADDRESSES: U.S. Army Corps of Engineers, Attn: CECW-CO-R, 441 G Street NW, Washington, DC 20314-1000. FOR FURTHER INFORMATION CONTACT: Mr. David Olson at 202-761-4922 or by email at david.b.olson@usace.army.mil , or access the U.S. Army Corps of Engineers Regulatory Home Page at https://www.usace.army.mil/​Missions/​Civil-Works/​Regulatory-Program-and-Permits/​ . SUPPLEMENTARY INFORMATION: Correction In the Federal Register of January 13, 2021, in FR Doc. 2021-00102 , appearing on page 2744, the following correction is made: 1. On page 2863, third column, correct the third paragraph of NWP 52 to read as follows: “The discharge must not cause the loss of greater than 1/2-acre of waters of the United States. The placement of a transmission line on the bed of a navigable water of the United States from the renewable energy generation unit(s) to a land-based collection and distribution facility is considered a structure under Sectio

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 86 FR 27274