Notice2020-204422020-09-16

Columbia Generating Station; Issuance of License Amendment Revising Technical Specification 3.8.7

Nuclear Regulatory Commission

Abstract

The U.S. Nuclear Regulatory Commission (NRC) approved a request by Energy Northwest (the licensee) for an amendment to Renewed Facility Operating License No. NPF-21, issued to the licensee for operation of the Columbia Generating Station, located in Benton County, Washington. The amendment adds a one-time extension to the completion time of Technical Specification (TS) 3.8.7, "Distribution Systems-- Operating," Condition A, from 8 hours to 16 hours, specifically associated with Division 2 alternating current electrical power distribution inoperability caused by inoperability of 120/240-volt power panel E-PP-8AE during repairs on its supply transformer E-TR-8A/ 1.

Action & Dates

Action
License amendment application; opportunity to request a hearing and to petition for leave to intervene.
Dates
A request for a hearing or petition for leave to intervene must be filed by November 16, 2020.

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Nuclear Regulatory Commission [Docket No. 50-397; NRC-2020-0213] AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application; opportunity to request a hearing and to petition for leave to intervene. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) approved a request by Energy Northwest (the licensee) for an amendment to Renewed Facility Operating License No. NPF-21, issued to the licensee for operation of the Columbia Generating Station, located in Benton County, Washington. The amendment adds a one-time extension to the completion time of Technical Specification (TS) 3.8.7, “Distribution Systems—Operating,” Condition A, from 8 hours to 16 hours, specifically associated with Division 2 alternating current electrical power distribution inoperability caused by inoperability of 120/240-volt power panel E-PP-8AE during repairs on its supply transformer E-TR-8A/1. DATES: A request for a hearing or petition for leave to intervene must be filed by November 16, 2020. ADDRESSES: Please refer to Docket ID NRC-2020-0213 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods: Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0213. Address questions about Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; email: Jennifer.Borges@nrc.gov . For tec

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 85 FR 57885