Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 8 is issuing a Notice of Intent to Delete the surface and unsaturated subsurface soils outside of the 4.5 acre Treated Soils Area of the Idaho Pole Company Superfund Site (Site) located in Bozeman, Gallatin County, Montana, from the NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Montana, through the Montana Department of Environmental Quality (MDEQ), have determined that all appropriate response actions at these identified media under CERCLA, other than operation and maintenance, monitoring and five-year reviews have been completed. However, this deletion does not preclude future actions under Superfund. This partial deletion pertains to the surface and unsaturated subsurface soils remedy component outside of the 4.5 acre Treated Soils Area of the Idaho Pole Company Superfund Site. The 4.5 acre Treated Soils Area is identified on the survey map in the docket and is the location where all treated soils were placed after on-site treatment. The groundwater and saturated subsurface soils within the historic groundwater table, and the Site's sediments are not being considered for deletion as part of this action.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Environmental Protection Agency 40 CFR Part 300 [EPA-HQ-SFUND-1986-0005; FRL-9996-90-Region 8] AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; notice of intent. SUMMARY: The Environmental Protection Agency (EPA) Region 8 is issuing a Notice of Intent to Delete the surface and unsaturated subsurface soils outside of the 4.5 acre Treated Soils Area of the Idaho Pole Company Superfund Site (Site) located in Bozeman, Gallatin County, Montana, from the NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Montana, through the Montana Department of Environmental Quality (MDEQ), have determined that all appropriate response actions at these identified media under CERCLA, other than operation and maintenance, monitoring and five-year reviews have been completed. However, this deletion does not preclude future actions under Superfund. This partial deletion pertains to the surface and unsaturated subsurface soils remedy component outside of the 4.5 acre Treated Soils Area of the Idaho Pole Company Superfund Site. The 4.5 acre Treated Soils Area is identified on the survey map in the docket and is the location where all treated soils were placed after on-site treatment. The groundwater and saturated subsurface soils within the historic groundwater table, a…
Other Federal Register documents from the same docket.
Deletions From the National Priorities List
Deletions From the National Priorities List
Proposed Deletion From the National Priorities List
Proposed Deletions From the National Priorities List
Deletions From the National Priorities List
Citation: 84 FR 34839