Base
Notice2019-128362019-06-19

Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah

Surface Transportation Board

Abstract

The Seven County Infrastructure Coalition (Coalition) plans to file a request with the Surface Transportation Board (Board) for authority to construct and operate an approximately 80-mile rail line between two terminus points in the Uinta Basin near Myton, Utah, and Leland Bench, Utah, and the interstate rail network. The construction and operation of the proposed rail line has the potential to result in significant environmental impacts; therefore, the Board's Office of Environmental Analysis (OEA) has determined that the preparation of an EIS is appropriate pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended. The purpose of this notice is to inform stakeholders--including members of the public; tribes; federal, state, and local agencies; environmental groups; and potential shippers-- interested in or potentially affected by the proposed project. OEA will hold public scoping meetings as part of the NEPA process. Comments submitted during scoping will assist OEA in defining the range of alternatives and potential impacts to be considered in the EIS. OEA has developed a Draft Scope of Study for the EIS for stakeholder review and comment. Public meeting dates and locations, along with the Draft Scope of Study, are provided below.

Action & Dates

Action
Notice of intent to prepare an environmental impact statement (EIS), availability of the draft scope of study for the EIS, scoping meetings, and request for comments.
Dates
Comments on the Draft Scope of Study for the EIS are due by August 3, 2019. See the SUPPLEMENTARY INFORMATION section for meeting dates.

Public Comment

Comments Close
2019-08-03

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Surface Transportation Board [Docket No. FD 36284] AGENCY: Surface Transportation Board. ACTION: Notice of intent to prepare an environmental impact statement (EIS), availability of the draft scope of study for the EIS, scoping meetings, and request for comments. SUMMARY: The Seven County Infrastructure Coalition (Coalition) plans to file a request with the Surface Transportation Board (Board) for authority to construct and operate an approximately 80-mile rail line between two terminus points in the Uinta Basin near Myton, Utah, and Leland Bench, Utah, and the interstate rail network. The construction and operation of the proposed rail line has the potential to result in significant environmental impacts; therefore, the Board's Office of Environmental Analysis (OEA) has determined that the preparation of an EIS is appropriate pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended. The purpose of this notice is to inform stakeholders—including members of the public; tribes; federal, state, and local agencies; environmental groups; and potential shippers—interested in or potentially affected by the proposed project. OEA will hold public scoping meetings as part of the NEPA process. Comments submitted during scoping will assist OEA in defining the range of alternatives and potential impacts to be considered in the EIS. OEA has developed a Draft Scope of Study for the EIS for stakeholder review and comment. Public meeting dates and locations, al

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 84 FR 28611