Notice2018-209332018-09-26

NexEra Energy Duane Arnold, LLC: Duane Arnold Energy Center

Nuclear Regulatory Commission

Abstract

The U.S. Nuclear Regulatory Commission (NRC) has granted the request of NextEra Energy Duane Arnold, LLC (NextEra) to withdraw its application dated December 19, 2017, for a proposed amendment to Duane Arnold Energy Center (DAEC), Facility Operating License No. DPR-49. The proposed change would have added Technical Specifications (TS) 3.2.3, "Linear Heat Generation Rate (LHGR)," and modified TS 1.1, "Definitions," TS 3.4.1, "Recirculation Loops Operating," and TS 5.6.5, "Core Operating Limits Report (COLR)" to reflect the LHGR change. Modifications associated with TS 3.2.1, "Average Planar Linear Heat Generation Rate (APLHGR)," and the new TS 3.2.3 would also have been added to the actions for TS 3.3.4.1, "End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation," and TS 3.7.7, "The Main Turbine Bypass System." Subsequently, by letter dated August 21, 2018, NextEra withdrew the amendment request.

Action & Dates

Action
License amendment application; withdrawal by applicant.
Dates
The applicable date of the withdrawal of the license amendment application is September 26, 2018.

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Nuclear Regulatory Commission [Docket No. 50-331; NRC-2018-0045] AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal by applicant. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of NextEra Energy Duane Arnold, LLC (NextEra) to withdraw its application dated December 19, 2017, for a proposed amendment to Duane Arnold Energy Center (DAEC), Facility Operating License No. DPR-49. The proposed change would have added Technical Specifications (TS) 3.2.3, “Linear Heat Generation Rate (LHGR),” and modified TS 1.1, “Definitions,” TS 3.4.1, “Recirculation Loops Operating,” and TS 5.6.5, “Core Operating Limits Report (COLR)” to reflect the LHGR change. Modifications associated with TS 3.2.1, “Average Planar Linear Heat Generation Rate (APLHGR),” and the new TS 3.2.3 would also have been added to the actions for TS 3.3.4.1, “End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation,” and TS 3.7.7, “The Main Turbine Bypass System.” Subsequently, by letter dated August 21, 2018, NextEra withdrew the amendment request. DATES: The applicable date of the withdrawal of the license amendment application is September 26, 2018. ADDRESSES: Please refer to Docket ID NRC-2018-0045 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 83 FR 48657