Base
Notice2018-084752018-04-24

GenH, Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Energy Department, Federal Energy Regulatory Commission

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission [Docket No. CD18-6-000] On April 12, 2018, GenH, Inc. filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA), as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The proposed McClellan Wash Hydro Station Project would have an installed capacity of 75 kilowatts (kW), and would be located at the existing McClellan Wash Drop along the Central Main Canal near Eloy, Pinal County, Arizona. Applicant Contact: Robert Freda, 306 Bellevue St., Boston, MA 02132, Phone No. (617) 435-6288. FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, email: Christopher.Chaney@ferc.gov . Qualifying Conduit Hydropower Facility Description: The proposed project would consist of: (1) Five 15-kW Turgo turbine units with a total installed capacity of 75 kW located at the McClellan Wash Drop of the Central Main Canal; and (2) appurtenant facilities. The proposed project would have an estimated annual generating capacity of about 900,000 kilowatt-hours. A qualifying conduit hydropower facility is one that is determined or deemed to meet all of the criteria shown in the table below. Preliminary Determination: The proposed addition of the hydroelectric project along the existing irrigation canal will not alter its primary purpose. Therefore, based upon the above information and criteria, Commission staff preliminarily determines that

Read full document on FederalRegister.gov →

Full Document

Citation: 83 FR 17818