Base
Notice2016-220532016-09-14

Notice of Cancellation To Prepare a Draft Environmental Impact Statement for the San Carlos Irrigation Project, Arizona

Interior Department, Reclamation Bureau

Abstract

The Bureau of Reclamation (Reclamation) is terminating preparation of an Environmental Impact Statement (EIS) for the San Carlos Irrigation Project. The proposed project scope has been modified, and Reclamation has determined that an Environmental Assessment (EA) rather than an EIS is the appropriate level of environmental documentation for the proposed action.

Action & Dates

Action
Notice.

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of the Interior Bureau of Reclamation [RR03250000; XXXR4079V1; RA.R3441003.0960000] AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY: The Bureau of Reclamation (Reclamation) is terminating preparation of an Environmental Impact Statement (EIS) for the San Carlos Irrigation Project. The proposed project scope has been modified, and Reclamation has determined that an Environmental Assessment (EA) rather than an EIS is the appropriate level of environmental documentation for the proposed action. FOR FURTHER INFORMATION CONTACT: Mr. Sean Heath at (623) 773-6250, or email at sheath@usbr.gov . SUPPLEMENTARY INFORMATION: The proposed project includes rehabilitation and modernization of San Carlos Irrigation Project Joint Works and District Works irrigation canals. Primary components of the rehabilitation are the lining of all or most of the main canals with concrete to reduce seepage and evaporation losses from the system, the modification of the canal prism (cross-sections and profiles) to increase system efficiency, the inclusion of a water storage facility, and modernized measurement and control amenities to improve delivery service. To protect and preserve the new lined conveyance system, separate storm water drainage facilities would be dedicated to cross drainage storm water management. A Notice of Intent to prepare the EIS for the San Carlos Irrigation Project was published in the Federal Register on August 31, 2010 ( 75 FR 53332 ). The proposed act

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 81 FR 63204

Notice of Cancellation To Prepare a Draft Environmental Impact Statement for the San Carlos Irrigation Project, Arizona — Federal Register 2016-22053 | Open Gov by Base