Energy Department, Federal Energy Regulatory Commission
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission [Project No. 2524-021] Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: P-2524-021. c. Date Filed: November 27, 2013. d. Applicant: Grand River Dam Authority. e. Name of Project: Salina Pumped Storage Project. f. Location: The existing project is located on the Saline Creek arm of Lake Hudson in the Grand River basin in Mayes County, Oklahoma. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r) . h. Applicant Contact: Dr. Darrell Townsend, P.O. Box 70, Langley, Oklahoma, 74350-0070; (918) 256-0616; dtownsend@grda.com . i. FERC Contact: Stephen Bowler, (202) 502-6861, or stephen.bowler@ferc.gov . j. This application is not ready for environmental analysis at this time. k. Description of Existing Project Facilities : The existing Salina Pumped Storage Project consists of: (1) The 762-acre W.R. Holway Reservoir (the upper reservoir), with a normal pool elevation between 850 feet and 865 feet National Geodetic Vertical Datum; (2) three rim dikes around the upper reservoir; (3) an 1,800-foot-long concrete-lined canal; (4) a 336-foot-wide, 62-foot-high forebay structure; (5) a 2,300-foot-long, 185-foot-high earthen dam; (6) six 14-foot-diameter penstocks, each between 630 and 680 feet long; (7) a powerhouse with six reversible pum…
Other Federal Register documents from the same docket.
Grand River Dam Authority; Notice of Availability of Draft Environmental Assessment
Grand River Dam Authority; Notice of Environmental Site Review
Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Citation: 78 FR 76604