Environmental Protection Agency
The U.S. Environmental Protection Agency Region 5 is publishing a direct final Notice of Deletion of the Quincy Smelter and Calumet Lake parcels of Operable Unit 3 (OU3) of the Torch Lake Superfund Site (Site), located in Houghton County, Michigan, from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA with the concurrence of the State of Michigan, through the Michigan Department of Environmental Quality (MDEQ), because EPA has determined that all appropriate response actions at these identified parcels under CERCLA, other than operation, maintenance, and five-year reviews, have been completed. However, this partial deletion does not preclude future actions under Superfund. This partial deletion pertains to the surface tailings and slag deposits of the Quincy Smelter and Calumet Lake parcels of OU3. The following parcels or areas will remain on the NPL and are not being considered for deletion as part of this action: Dollar Bay, Point Mills, Boston Pond, and North Entry.
Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Environmental Protection Agency 40 CFR Part 300 [EPA-HQ-SFUND-1986-0005; FRL-9846-4] AGENCY: U.S. Environmental Protection Agency. ACTION: Direct final rule. SUMMARY: The U.S. Environmental Protection Agency Region 5 is publishing a direct final Notice of Deletion of the Quincy Smelter and Calumet Lake parcels of Operable Unit 3 (OU3) of the Torch Lake Superfund Site (Site), located in Houghton County, Michigan, from the National Priorities List (NPL). The NPL, promulgated pursuant to Section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA with the concurrence of the State of Michigan, through the Michigan Department of Environmental Quality (MDEQ), because EPA has determined that all appropriate response actions at these identified parcels under CERCLA, other than operation, maintenance, and five-year reviews, have been completed. However, this partial deletion does not preclude future actions under Superfund. This partial deletion pertains to the surface tailings and slag deposits of the Quincy Smelter and Calumet Lake parcels of OU3. The following parcels or areas will remain on the NPL and are not being considered for deletion as part of this action: Dollar Bay, Point Mills, Boston Pond, and North Entry. DATES: This direct final partial deletion is effective…
Other Federal Register documents from the same docket.
Deletions From the National Priorities List
Deletions From the National Priorities List
Proposed Deletion From the National Priorities List
Proposed Deletions From the National Priorities List
Deletions From the National Priorities List
Citation: 78 FR 49939