The U.S. Nuclear Regulatory Commission (NRC or Commission) proposes to amend its regulations to certify the Economic Simplified Boiling-Water Reactor (ESBWR) standard plant design. This action is necessary so that applicants or licensees intending to construct and operate an ESBWR design may do so by referencing this design certification rule (DCR). The applicant for certification of the ESBWR design is GE-Hitachi Nuclear Energy (GEH). The public is invited to submit comments on this proposed DCR, the generic design control document (DCD) that would be incorporated by reference into the DCR, and the environmental assessment (EA) for the ESBWR design.

Action & Dates

Action
Proposed rule.
Dates
Submit comments on the DCR, DCD and/or EA by June 7, 2011. Submit comments specific to the information collections aspects of this rule by April 25, 2011. Comments received after the above dates will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after these dates.

CFR References

Topics

Administrative practice and procedureAntitrustFeesIncorporation by referenceNuclear power plants and reactorsReporting and recordkeeping requirements

Public Comment

Comments Close
2011-06-07

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Nuclear Regulatory Commission 10 CFR Part 52 [NRC-2010-0135] RIN 3150-AI85 AGENCY: Nuclear Regulatory Commission. ACTION: Proposed rule. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or Commission) proposes to amend its regulations to certify the Economic Simplified Boiling-Water Reactor (ESBWR) standard plant design. This action is necessary so that applicants or licensees intending to construct and operate an ESBWR design may do so by referencing this design certification rule (DCR). The applicant for certification of the ESBWR design is GE-Hitachi Nuclear Energy (GEH). The public is invited to submit comments on this proposed DCR, the generic design control document (DCD) that would be incorporated by reference into the DCR, and the environmental assessment (EA) for the ESBWR design. DATES: Submit comments on the DCR, DCD and/or EA by June 7, 2011. Submit comments specific to the information collections aspects of this rule by April 25, 2011. Comments received after the above dates will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after these dates. ADDRESSES: Please include Docket ID NRC-2010-0135 in the subject line of your comments. For instructions on submitting comments and accessing documents related to this action, see Section I, “Submitting Comments and Accessing Information” in the SUPPLEMENTARY INFORMATION section of this document. You may submit comments by any one of the follow

Read full document on FederalRegister.gov →

Related Documents

Other Federal Register documents from the same docket.

Full Document

Citation: 76 FR 16549