Base
Rule2011-174672011-07-13

Approval and Promulgation of Implementation Plans; Mississippi; 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards

Environmental Protection Agency

Abstract

EPA is taking final action to approve the December 7, 2007, submission by the State of Mississippi, through the Mississippi Department of Environmental Quality (MDEQ) as demonstrating that the State meets the implementation plan (SIP) requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 8- hour ozone national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by the EPA, which is commonly referred to as an "infrastructure" SIP. Mississippi certified that the Mississippi SIP contains provisions that ensure the 1997 8-hour ozone NAAQS is implemented, enforced, and maintained in Mississippi (hereafter referred to as "infrastructure submission"). Mississippi's infrastructure submission, provided to EPA on December 7, 2007, addressed all the required infrastructure elements for the 1997 8-hour ozone NAAQS. Additionally, EPA is responding to adverse comments received on EPA's March 17, 2011, proposed approval of Mississippi's December 7, 2007, infrastructure submission.

Action & Dates

Action
Final rule.
Dates
Effective Date: This rule will be effective August 12, 2011.
Effective Date
2011-08-12

CFR References

Topics

Air pollution controlEnvironmental protectionIncorporation by referenceIntergovernmental relationsNitrogen dioxideOzoneReporting and recordkeeping requirementsVolatile organic compounds

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Environmental Protection Agency 40 CFR Part 52 [EPA-R04-OAR-2010-0722-201125 FRL-9436-6] AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the December 7, 2007, submission by the State of Mississippi, through the Mississippi Department of Environmental Quality (MDEQ) as demonstrating that the State meets the implementation plan (SIP) requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 8-hour ozone national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by the EPA, which is commonly referred to as an “infrastructure” SIP. Mississippi certified that the Mississippi SIP contains provisions that ensure the 1997 8-hour ozone NAAQS is implemented, enforced, and maintained in Mississippi (hereafter referred to as “infrastructure submission”). Mississippi's infrastructure submission, provided to EPA on December 7, 2007, addressed all the required infrastructure elements for the 1997 8-hour ozone NAAQS. Additionally, EPA is responding to adverse comments received on EPA's March 17, 2011, proposed approval of Mississippi's December 7, 2007, infrastructure submission. DATES: Effective Date: This rule will be effective August 12, 2011. ADDRESSES: EPA has established a docket for this action under Docket Identification

Read full document on FederalRegister.gov →

Full Document

Citation: 76 FR 41123