Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

Energy Department, Federal Energy Regulatory Commission

Abstract

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs.

Action & Dates

Action
Order on rehearing and clarification.
Dates
The effective date of the document published on December 6, 2024 (89 FR 97174), is confirmed: January 6, 2025.
Effective Date
2025-01-06

CFR References

Document Excerpt

Document Headings Document headings vary by document type but may contain the following: the agency or agencies that issued and signed a document the number of the CFR title and the number of each part the document amends, proposes to amend, or is directly related to the agency docket number / agency internal file number the RIN which identifies each regulatory action listed in the Unified Agenda of Federal Regulatory and Deregulatory Actions See the Document Drafting Handbook for more details. Department of Energy Federal Energy Regulatory Commission 18 CFR Part 35 [Docket No. RM21-17-003; Order No.1920-B] AGENCY: Federal Energy Regulatory Commission. ACTION: Order on rehearing and clarification. SUMMARY: In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs. DATES: The effective date of the document published on December 6, 2024 ( 89 FR 97174 ), is confirmed: January 6, 2025. FOR FURTHER INFORMATION CONTACT: Patrick T. Metz (Legal Information), Office of the General Counsel, 888 First Street NE, Washington, DC 20426, (202) 502-8197, patrick.metz@ferc.gov Michael Kellermann (Legal Information), Office of the General Counsel, 888 First Street NE, Washington, DC 20426, (202) 502-8491, michael.kellermann@ferc.gov David Borden (Technical Information), Office of Energy Policy and Innovation, 888 First Street NE, Washington, DC 20426, (202) 502-8734, david.borden@ferc.gov Noah Lichtenstein (Technical Information), Office of Energy Mar

Read full document on FederalRegister.gov →

Full Document

Citation: 90 FR 17692